WAITING_FOR_PRE_VALIDATION | The plan was entered into the execution queue, it was not yet validated or checked, and eventually may not get executed |
BACKUPS_ARE_DISABLED | The plan will not execute - all backups were disabled (see Configurable Parameters and Settings) |
SYNCS_ARE_DISABLED | The plan will not execute - all syncs were disabled (see Configurable Parameters and Settings) |
PREPROCESS_EXECUTION_SKIPPED_BECAUSE_A_DAY_PASSED | The plan was waiting in the WAITING_FOR_PRE_VALIDATION status for a day or more and will be canceled |
PRE_VALIDATION_QUIESCE_TIMEOUT_SYSPARM_TOO_SHORT | The plan will not execute - the configured quiesce parameter (see Configurable Parameters and Settings) is shorter than 60 seconds |
PRE_VALIDATION_OUT_OF_MAINTENANCE_WINDOW | The plan will not execute - the current time is not within the maintenance window (see Maintenance Concepts for more information about the maintenance window), the maintenance window is checked for all execution types - schedules, ad-hoc via the UI and via the REST API |
PRE_VALIDATION_STORE_IS_NOT_MOUNTED | The plan will not execute - for backup plans - the backup destination must be a mounted remote filesystem , you cannot backup to the local filesystem created during DPOD installation (see Configurable Parameters and Settings on how to change the destination) |
PRE_VALIDATION_BACKUP_STORE_OUT_OF_SPACE | The plan will not execute - there is not enough space in the backup destination path (DPOD checks the free space percent on the mounted path, see Configurable Parameters and Settings on how to change the threshold) |
PRE_VALIDATION_BACKUP_STORE_PATH_NOT_FOUND | The plan will not execute - the backup destination path was not found (see Configurable Parameters and Settings on how to change the destination) |
NO_TASKS_CREATED | The plan will not execute - no tasks created, this can happen, if no devices or domains were matching the pattern in the activity, or if no devices were available. for example, the backup activity specified Device QA1 and domain Bank*, but no such domains exist on device QA1. |
NO_ELIGIBLE_TASKS | The plan will not execute - some tasks were created, but all of them were skipped or failed validations. For example, secure backup task for a device that was not in DR mode |
PRE_VALIDATIONS_STARTED STARTED_DIVIDING_TO_TASKS TASKS_VALIDATIONS_STARTED TASKS_VALIDATIONS_FINISHED | Interim statuses - only used as progress indication, the plan will usually not stay in this status for more than a few minutes. |
READY_FOR_EXECUTION | Interim status - the plan passed all validation and has some tasks waiting for execution, it is queued and will be executed in the next minute, or is waiting for other plans to finish executing first. |
PRE_PLAN_SCRIPT_STARTED | Interim status - the plan is waiting for the pre-plan script to finish execute |
PRE_PLAN_SCRIPT_FAILED | The plan will not execute - the pre-plan script returned with a return code greater than 0 |
EXECUTING | Interim status - one or more tasks started executing |
POST_PLAN_SCRIPT_STARTED | Interim status - the plan is waiting for the post-plan script to finish execute |
POST_PLAN_SCRIPT_FAILED | The plan finished executing, but the post-plan script returned with a return code greater than 0 |
SUCCESS_WITH_SKIPPED_TASKS | All tasks either finished successfully one or more tasks skipped (for example, because the device was not available) |
SUCCESS | All tasks finished successfully |
FAILED | One or more tasks failed |
IBM DataPower Operations Dashboard v1.0.6.0
A newer version of this product documentation is available.
You are viewing an older version. View latest at IBM DPOD Documentation.
Manage space
Manage content
Integrations