IBM DataPower Operations Dashboard v1.0.6.0

A newer version of this product documentation is available.

You are viewing an older version. View latest at IBM DPOD Documentation.

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 29 Next »

This guide will help you get started with IBM® DataPower® Operations Dashboard v.1.0.5.0

Product Overview

IBM® DataPower® Operations Dashboard delivers advanced operations for real-time visibility of transactions and centralized operations to enable quicker problem resolution and operational resiliency. The product installation media is provided as a bootable ISO file, that can be deployed on a virtual machine as well as physical hardware. For more information about system requirements or a detailed installation procedure, please consult the administration guide.

Step 1: Obtain the software

Download the package from IBM® Passport Advantage®. The package includes the following components:

  • The image to deploy:
    • An ISO file for Appliance package (Std or Developer Edition).
    • A CEF file (Compressed Executable File) for Non-Appliance package.
  • This document.

Step 2: Review hardware and system configuration

The Product supports installation on either physical hardware or hypervisors.

The product supports the following hypervisors:

  • VMware vSphere ESX v5.5 , v6.0, v6.5
  • VMware Workstation Pro v12 , v12.5
  • VMware Workstation Player v12 , v12.5
  • VMware Fusion v8.0
  • PureApp (only on Intel Processors) - no pattern yet available, can be provided only as an imported OVA.
  • For Hyper-V support - contact your IBM sales representative

Installation on a physical hardware requires Intel® based CPUs (supporting 64 bit arch) and hardware that is supported by CentOS 7.2.0 / RHEL 7.2.0 - 64Bit.

The minimum resource allocation for the Developer Edition installation is as follows:

  • 2 virtual processors (vCPU)
  • Minimum of 3 GB RAM (4 GB recommended)
  • Disk space of 20GB (if thick provisioned) or 20GB (if thin provisioned as below), with only 1 disk

The minimum resource allocation for Standard Edition:

  • 4 virtual processors (vCPU)
  • 18 GB RAM 
  • Disk space of 180 GB (thick provisioned) configured as follows:
    • Appliance package - Storage space must be divide divided to 3 disks:
      • Operating System - 40GB
      • Install - 40GB
      • Data - 100GB 
    • Non Appliance package - follow the Appliance configuration for performance.
      • The installation process will not verify the usage of 3 Disks but performance issues can not be addressed if this configuration is not applied.

Step 3 -  Installation

Option A - Appliance and software installation

Install the ISO file

 Use the appropriate ISO file to install DPOD:
  • Standard Edition (Production and Non-Production Environment)
    • Appliance Package - IBM_DataPower_OpDashbaord_v.v.v.iso  
    • Non Appliance Package - IBM_DataPower_OpDashbaord_RH_v.v.v.iso
  • Developer Edition: IBM_DataPower_OpDashbaord_Dev_v.v.v.iso  

When installing on a physical hardware:

  • The ISO file should be burned to a bootable DVD or copied to a bootable USB drive.
  • Make sure to enable the bootable DVD or USB drive in the machine's BIOS boot order list.

When installing on a virtual environment:

  • Create a new virtual machine based on the system requirements above.
  • Make sure to define a DVD/CD in the virtual machine configuration.
  • Link the DVD/CD defined before to the ISO file.

Start the machine and follow the steps below:

  • Accept license agreement.
  • Follow the on screen instructions and provide the installation script with general OS parameters such as time, time zone, NTP, Network and more.

  • Set passwords for the application user and root user.

  • Wait for system to reboot.

Deploy Software

  • Login as root with the password you set in a previous step.
  • Execute the following command:
    • installApp
  • Follow the instructions on screen until the installation finishes successfully.

Option B: Software Installation on a pre-prepared Appliance

Install the CEF file

You can install DPOD on an fresh, dedicated pre installed CentOS/RHEL 7.2 by following the steps below:
  • Prepare your appliance.
  • Download the CEF package and move it to the /tmp folder of your server.
  • Run the CEF package and follow the on-screen instructions.
  • Verify your installation.

Step 4: Get started

  • Access the Web console via the URL: https://<DPOD ip address>
  • Sign in using the default credentials (case sensitive):
    • Username: admin
    • Password: adminuser
  • Perform the verification steps as described in the administrative guide.
  • Perform the  post-installation steps as described in the administrative guide.
  • No labels