IBM DataPower Operations Dashboard v1.0.12.0

A newer version of this product documentation is available.

You are viewing an older version. View latest at IBM DPOD Documentation.

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Overview

The Appliance Migration wizard helps with migration of a source gateway to a different target gateway,
It automatically performs secure-backup on the source gateway, and secure-restore on the target gateway, while providing an easy step-by-step wizard to guide the admin in the process.


Overview of the Migration Steps:

  1. Limitations and prerequisites
  2. input the source and target gateways details
  3. Pre-Backup Validations (for example, if the target gateway is available at this point - check if the firmware levels are identical)
  4. Secure-Backup of the source gateway
  5. Removal of the source gateway from DPOD (optional)
  6. A second set of validations 
  7. Secure-Restore to the target gateway



  • No labels